Material Takeoff

A material takeoff is the process of calculating and listing all materials needed for a construction project based on plans and specifications.

What is a Material Takeoff?

A material takeoff (also called a quantity takeoff) is the systematic process of identifying, measuring, and listing all materials required for a construction project based on architectural plans, blueprints, and specifications.

It serves as the foundation for accurate cost estimation and material ordering.

Types of Takeoffs

Manual Takeoff

Using rulers, calculators, and paper to manually measure and calculate quantities from printed plans.

Digital Takeoff

Using specialized software to measure directly from digital plans, automatically calculating quantities and generating lists.

Assembly Takeoff

Grouping related materials together (like all framing materials for a wall assembly).

Common Takeoff Categories

Structural Materials

  • Lumber dimensions and quantities
  • Concrete volumes
  • Steel quantities and sizes
  • Fasteners and hardware

Finish Materials

  • Flooring square footage
  • Paint quantities
  • Trim linear footage
  • Fixtures and accessories

Mechanical/Electrical

  • Pipe and conduit lengths
  • Wire quantities
  • Fixture counts
  • Connection requirements

Takeoff Process

1. Review Plans

Study all drawings, specifications, and details thoroughly.

2. Organize by Trade

Group materials by work phase or trade contractor.

3. Measure Systematically

Work through plans methodically, avoiding double-counting.

4. Apply Waste Factors

Add appropriate percentages for cutting waste and errors.

5. Cross-Check

Verify quantities using different methods when possible.

Waste Factors by Material

Lumber: 5-10% waste for cutting and defects.

Concrete: 5-8% waste for spillage and over-excavation.

Drywall: 10-15% waste for cutting around openings.

Flooring: 10-15% waste depending on layout complexity.

Paint: 5-10% waste for touch-ups and coverage variations.

Best Practices

Use Standard Units: Measure in units materials are sold in (square feet, linear feet, pieces).

Include Everything: Don't forget small items like fasteners, sealants, and accessories.

Update Regularly: Revise takeoffs when plans change during construction.

Keep Records: Save takeoffs for future similar projects and warranty purposes.

Get Multiple Quotes: Use accurate takeoffs to get competitive material pricing.

Ready to Put Your Knowledge to Work?

Let Dave help you organize your business like a pro.